Start a conversation
Building fasterlightermore precise

LSF members are cut in the factory to a ±2 mm tolerance.

Available for new projects

Building faster, lighter and more precise.

From architectural design and structural calculation to fabrication and delivery — one engineered, integrated path built on LSF.

Who we are

What we design is what we build.

Paya LSF is the specialist brand of Paya Rasa Sana Co. for the design, calculation, consulting and construction of light steel frame (LSF) structures. From architectural design and structural calculation to component supply and delivery, the build is run as one integrated, specialist process.

What we build

  • Residential villas
  • Commercial & apartments
  • Floor additions
  • Industrial sheds
  • Solar-panel mounting structures
  • Drywall and partitions
More about PAYA LSF
  1. 5+ years of LSF experience
  2. 30+ projects successfully delivered
  3. 3–5× faster construction
  4. 3,031 m² built with LSF

Selected work

Delivered projects.

Villa

Ferdows Villa

Freedom in design, with maximum use of interior space

Ferdows Villa, 65 m² in floor area, was designed and built to make the most of its usable interior space. The architectural form and the LSF structural system were developed together, keeping the plan simple and the interior flexible and practical.

Location
Rafsanjan
Area
65 m²
Year
2024
Client
Private client

Challenge

Making the most of the interior

Solution

A structure that follows the plan

Result

More space, at a small scale

Villa

Sepidar Villa | A-Frame

Architectural design, structural calculation and LSF construction

Sepidar Villa is an 85 m² two-storey villa with an A-Frame form, whose architecture and structural system were developed together. Here, LSF was used to shape the architectural form precisely and to build a light, engineered structure.

Location
Rafsanjan
Area
85 m²
Year
2024
Client
Private client

Challenge

The A-Frame form called for close coordination between architecture and structure.

Solution

LSF was chosen to build the A-Frame form precisely.

Result

Architecture and structure took shape as one.

Villa

Abad Villa

An 81 m² villa, built fast with LSF

Abad Villa is an 81 m² project outside the city limits, built with an LSF structural system. Limited access to the site and the need for a fast build made a light, assemble-on-site system the right choice.

Location
Rafsanjan
Area
81 m²
Year
2025
Client
Private client

Solution

LSF made it possible to transport the structure and assemble it quickly on site.

Result

An 81 m² villa with a light, site-assembled structure was built.

Villa

Shahrokh Villa

An engineered solution for building in a mountain climate

Shahrokh Villa is an 85 m² villa in a mountain area, designed and built with an LSF structural system. The climate, the cold and the need for a precisely built structure were the main factors in choosing the system and designing the project.

Location
Rafsanjan
Area
85 m²
Year
2023
Client
Private client

Solution

LSF was chosen for a light, precise structure suited to the project's conditions.

Result

Architecture, structure and climate requirements came together in one solution.

How PAYA LSF builds

The build and delivery process.

Scroll over the stages, or pick one.

  1. Steps 01–02

    Design & modeling

    Architecture review, structural calculation and the technical brief — then a precise structural model with fabrication and assembly drawings.

  2. Steps 03–05

    Fabricate, ship & assemble

    Galvanized members are cut to the shop drawings, sorted and shipped in assembly order, then raised with standard fixings.

  3. Step 06

    Build

    Walls, roof, insulation, services and finishes go in.

  4. Step 07

    Handover

    Final checks, finishing touches, and the building is ready for use.

Why LSF

Light, fast, engineered.

Light steel framing makes the parts before they reach site — the result is a faster, more precise build.

3–5× faster construction

Build time drops sharply compared with conventional methods: projects finish in weeks, not months.

A lighter structure

Keeps foundations to a minimum while delivering more strength at a lower cost.

For city and remote sites

Suited to urban construction and ideal for remote, hard-to-reach projects.

Floor additions without damage

The best way to add storeys to an existing building, with no strengthening and no damage to the existing building.

Better thermal performance

An LSF wall with the right insulation reduces heat transfer and helps improve the building’s energy performance.

High earthquake resistance

Steel structures perform very well in earthquakes, beyond what building codes require.

Dry, clean construction

Minimal waste and no wet work: a cleaner site with less environmental impact.

Integrated services routing

Electrical and plumbing runs can be laid out inside LSF walls; with the routes and openings planned ahead, the services are coordinated with the structure from the start.

Related articles

Read before you decide.

All articles

FAQ

Questions, answered.

Short answers to what usually comes up before an LSF project begins. Something else on your mind? Talk to us directly.

Ask your question
01How long does an LSF villa take to build?

It varies with size and complexity, but LSF construction is usually far faster than traditional methods.

Villa Design and Construction
02Do you handle architecture too, or only construction?

We handle the whole path—architectural design, structural calculation, construction, and handover—as one process.

Villa Design and Construction
03Do you build outside the city?

Yes—light weight and prepared parts make building in urban, rural, and hard-to-access areas possible.

Villa Design and Construction
04Is adding a floor without demolition really possible?

Yes—LSF's light structure lets you add a floor without full demolition, provided the existing structure's calculations allow it.

Floor Additions
05At what stage can I use consulting?

From the initial review and structural-system choice through the build stages, we're with you.

Consulting & Technical Supervision
06How does consulting help project cost?

Precise decisions before construction and fewer errors and reworks help control time and cost.

Consulting & Technical Supervision

Bring your site, idea or building problem to the Paya team.

Start a conversation
PAYA LSF

Specialist design, calculation and construction of LSF structures

Get in touch